1 00:00:34,750 --> 00:00:32,950 on august 11 the s15 stage si u5 and 2 00:00:37,270 --> 00:00:34,760 payload for the fifth Saturn flight 3 00:00:40,209 --> 00:00:37,280 vehicle left Marshall aboard the barge 4 00:00:42,549 --> 00:00:40,219 promised the barge arrived at the Cape 5 00:00:45,280 --> 00:00:42,559 on August 21st and the booster was 6 00:00:48,069 --> 00:00:45,290 delivered to Launch Complex 37 B two 7 00:00:52,119 --> 00:00:48,079 days later erection was completed on 8 00:00:55,060 --> 00:00:52,129 August 26th booster fins and the s4 9 00:00:56,700 --> 00:00:55,070 spacer were installed the instrument 10 00:00:59,049 --> 00:00:56,710 unit was structurally modified 11 00:01:02,079 --> 00:00:59,059 transferred to the launch complex and 12 00:01:04,990 --> 00:01:02,089 mated pre-launch checks and tests are 13 00:01:09,219 --> 00:01:05,000 being performed on schedule no major 14 00:01:11,530 --> 00:01:09,229 problems have been encountered pre 15 00:01:14,080 --> 00:01:11,540 static check out of s4 five was 16 00:01:16,210 --> 00:01:14,090 completed early in August the first 17 00:01:18,819 --> 00:01:16,220 flight acceptance test attempted on 18 00:01:21,310 --> 00:01:18,829 August 5th was aborted at sixty three 19 00:01:24,399 --> 00:01:21,320 and six ten seconds due to an indication 20 00:01:26,740 --> 00:01:24,409 of fire in the engine area subsequent 21 00:01:28,980 --> 00:01:26,750 investigations indicated that the fire 22 00:01:32,230 --> 00:01:28,990 detection system had malfunctioned the 23 00:01:35,260 --> 00:01:32,240 second test conducted August 12th was 24 00:01:37,540 --> 00:01:35,270 successful preliminary review of test 25 00:01:40,180 --> 00:01:37,550 data indicated that all systems 26 00:01:43,480 --> 00:01:40,190 performed satisfactorily and all test 27 00:01:46,930 --> 00:01:43,490 objectives were achieved cutoff occurred 28 00:01:50,860 --> 00:01:46,940 with LOX depletion at 477 seconds as 29 00:01:52,780 --> 00:01:50,870 planned post firing inspection revealed 30 00:01:56,410 --> 00:01:52,790 no damage to the stand and support 31 00:01:58,840 --> 00:01:56,420 equipment following post static check 32 00:02:01,359 --> 00:01:58,850 out and retrofit the stage was removed 33 00:02:07,139 --> 00:02:01,369 from the stand on September 14th at 34 00:02:11,140 --> 00:02:07,149 preparation for shipment began on 35 00:02:13,000 --> 00:02:11,150 September 20th the s45 stage left sacto 36 00:02:16,089 --> 00:02:13,010 aboard the guppy which was recently 37 00:02:19,509 --> 00:02:16,099 certified under FAA regulations and 38 00:02:21,640 --> 00:02:19,519 arrived at the Cape on September 21st by 39 00:02:25,300 --> 00:02:21,650 mid October the stage will be mated to 40 00:02:31,830 --> 00:02:25,310 the SI 5 booster Saturn 5 is scheduled 41 00:02:34,449 --> 00:02:31,840 for launch late next quarter at 42 00:02:36,459 --> 00:02:34,459 Marshalls test laboratory dynamic 43 00:02:39,009 --> 00:02:36,469 testing of the s4 stage 44 00:02:41,860 --> 00:02:39,019 instrument unit Apollo spacecraft and 45 00:02:43,630 --> 00:02:41,870 launch escape system for the SI 5 config 46 00:02:47,920 --> 00:02:43,640 duration was successfully completed 47 00:02:50,680 --> 00:02:47,930 early in this quarter following removal 48 00:02:52,930 --> 00:02:50,690 of the s for stage instrument unit an 49 00:02:56,710 --> 00:02:52,940 Apollo boilerplate from the stand in mid 50 00:03:00,460 --> 00:02:56,720 July preparation for sa6 dynamic testing 51 00:03:02,680 --> 00:03:00,470 was begun on July 25th the booster was 52 00:03:06,550 --> 00:03:02,690 erected in the dynamic stand and the 53 00:03:08,140 --> 00:03:06,560 fans installed the s for stage the 54 00:03:10,089 --> 00:03:08,150 instrument unit and the Apollo 55 00:03:13,660 --> 00:03:10,099 boilerplate were erected within two 56 00:03:16,539 --> 00:03:13,670 weeks dynamic testing of the complete 57 00:03:20,289 --> 00:03:16,549 vehicle began on August 21st and is 58 00:03:22,690 --> 00:03:20,299 proceeding as planned during the quarter 59 00:03:25,150 --> 00:03:22,700 Fairchild Stratus continued development 60 00:03:28,530 --> 00:03:25,160 of the micrometeoroid satellite which 61 00:03:31,240 --> 00:03:28,540 will be placed in orbit by sa9 and si8 62 00:03:33,520 --> 00:03:31,250 design of the data satellite system was 63 00:03:35,949 --> 00:03:33,530 completed the function of this system 64 00:03:38,530 --> 00:03:35,959 will be to collect store and condition 65 00:03:42,149 --> 00:03:38,540 for transmission to earth micrometeoroid 66 00:03:45,430 --> 00:03:42,159 data collected by the satellite in 67 00:03:47,039 --> 00:03:45,440 mid-july the s4 dynamics facilities 68 00:03:49,390 --> 00:03:47,049 checkout vehicle was successfully 69 00:03:51,309 --> 00:03:49,400 transported aboard the guppy from the 70 00:04:02,190 --> 00:03:51,319 Atlantic Missile Range to the west coast 71 00:04:06,839 --> 00:04:04,350 the booster for the sixth Saturn one 72 00:04:08,839 --> 00:04:06,849 flight vehicle si six is presently 73 00:04:11,160 --> 00:04:08,849 undergoing post static checkout 74 00:04:13,620 --> 00:04:11,170 completion of checkout and remaining 75 00:04:16,110 --> 00:04:13,630 booster work including shipment have 76 00:04:19,110 --> 00:04:16,120 been revised to match the present s for 77 00:04:22,159 --> 00:04:19,120 six scheduled post static checkout is 78 00:04:24,390 --> 00:04:22,169 now scheduled for completion in October 79 00:04:26,520 --> 00:04:24,400 preparation for shipment is underway 80 00:04:28,980 --> 00:04:26,530 then the stage will be stored at 81 00:04:34,230 --> 00:04:28,990 Marshall until late December when Cape 82 00:04:35,909 --> 00:04:34,240 shipment will occur pre static checkout 83 00:04:38,879 --> 00:04:35,919 of the booster for the seventh flight 84 00:04:41,610 --> 00:04:38,889 vehicle sa seven was completed early in 85 00:04:44,280 --> 00:04:41,620 September the stage has now been erected 86 00:04:47,280 --> 00:04:44,290 in the static test stand and propellant 87 00:04:49,290 --> 00:04:47,290 loading operations are underway the 88 00:04:52,320 --> 00:04:49,300 first test firing is scheduled for the 89 00:04:54,330 --> 00:04:52,330 first of October at Marshalls 90 00:04:56,719 --> 00:04:54,340 manufacturing engineering laboratory 91 00:04:59,129 --> 00:04:56,729 assembly of the booster for sa9 92 00:05:03,680 --> 00:04:59,139 continued this quarter with engine 93 00:05:09,600 --> 00:05:06,990 at mizzou Chrysler Corporation is 94 00:05:12,719 --> 00:05:09,610 completing s18 tail area Phase two 95 00:05:14,610 --> 00:05:12,729 assembly an installation on board 96 00:05:17,070 --> 00:05:14,620 engines installation began late in 97 00:05:20,040 --> 00:05:17,080 August outboard engines are being 98 00:05:24,170 --> 00:05:20,050 modified stage assembly completion is 99 00:05:27,870 --> 00:05:24,180 expected September 30th as scheduled 100 00:05:30,420 --> 00:05:27,880 early in September s 110 fuel tanks were 101 00:05:33,210 --> 00:05:30,430 clustered all engines have been received 102 00:05:35,040 --> 00:05:33,220 and are undergoing modification stage 103 00:05:38,779 --> 00:05:35,050 assembly is expected to be completed 104 00:05:41,190 --> 00:05:38,789 late next quarter as scheduled 105 00:05:43,260 --> 00:05:41,200 fabrication of the second stage adapter 106 00:05:47,880 --> 00:05:43,270 and tail section assemblies is underway 107 00:05:52,170 --> 00:05:47,890 for s11 11 for 70-inch fuel tanks and 108 00:05:54,350 --> 00:05:52,180 the 105 inch LOX tank and 270 inch LOX 109 00:05:56,880 --> 00:05:54,360 tanks were received by mid-september 110 00:06:01,260 --> 00:05:56,890 tank clustering is expected to begin 111 00:06:03,659 --> 00:06:01,270 early next quarter at massĂș the first 112 00:06:06,060 --> 00:06:03,669 booster check out complex was activated 113 00:06:06,690 --> 00:06:06,070 this quarter delivery and check out of 114 00:06:09,210 --> 00:06:06,700 packard-bell 115 00:06:11,880 --> 00:06:09,220 automatic equipment is complete the 116 00:06:13,980 --> 00:06:11,890 complex consists of packard-bell 250 117 00:06:16,020 --> 00:06:13,990 general-purpose computers linked 118 00:06:19,020 --> 00:06:16,030 together by common memory element 119 00:06:21,420 --> 00:06:19,030 under a master/slave circuit stage 120 00:06:23,970 --> 00:06:21,430 hardware forms a closed-loop system 121 00:06:26,490 --> 00:06:23,980 which provides generation switching and 122 00:06:29,250 --> 00:06:26,500 response retrieval all under computer 123 00:06:32,490 --> 00:06:29,260 control the equipment is scheduled to 124 00:06:39,930 --> 00:06:32,500 become operational next quarter with s18 125 00:06:43,110 --> 00:06:39,940 checkout to begin in mid-october at 126 00:06:45,810 --> 00:06:43,120 santa monica retrofit and modification 127 00:06:48,420 --> 00:06:45,820 of the s4 sixth stage continued 128 00:06:50,370 --> 00:06:48,430 throughout the report period transfer of 129 00:06:52,440 --> 00:06:50,380 the stage to the test site was delayed 130 00:06:54,600 --> 00:06:52,450 so certain modifications could be 131 00:06:57,600 --> 00:06:54,610 performed at santa monica rather than 132 00:07:00,440 --> 00:06:57,610 its act o flight qualification testing 133 00:07:03,720 --> 00:07:00,450 is expected to begin during october s 134 00:07:06,000 --> 00:07:03,730 4/7 stage is behind schedule due to late 135 00:07:07,110 --> 00:07:06,010 engineering releases and qualification 136 00:07:10,560 --> 00:07:07,120 testing problems 137 00:07:12,720 --> 00:07:10,570 the s4 nine stage has been moved to the 138 00:07:15,140 --> 00:07:12,730 assembly area and preparations are 139 00:07:18,570 --> 00:07:15,150 underway for start of final installation 140 00:07:21,270 --> 00:07:18,580 start of s4 nine installation remains 141 00:07:25,940 --> 00:07:21,280 dependent on completion of s4 seven work 142 00:07:28,950 --> 00:07:25,950 scheduled and the assembly tower at 143 00:07:31,770 --> 00:07:28,960 Sacramento on August 21st the all 144 00:07:34,890 --> 00:07:31,780 systems s4 vehicle underwent two 145 00:07:37,410 --> 00:07:34,900 successful propellant loading tests test 146 00:07:39,720 --> 00:07:37,420 objectives included functional checks of 147 00:07:43,020 --> 00:07:39,730 the common bulkhead system propellant 148 00:07:46,140 --> 00:07:43,030 transfer system lh2 tanking system and 149 00:07:48,480 --> 00:07:46,150 fuel tank insulation post-test 150 00:07:51,930 --> 00:07:48,490 inspection revealed no structural stage 151 00:07:54,510 --> 00:07:51,940 damaged vehicle build-up to support hot 152 00:08:03,570 --> 00:07:54,520 firings has begun and is scheduled for 153 00:08:10,710 --> 00:08:08,040 at Marshall si u6 checkout is proceeding 154 00:08:13,320 --> 00:08:10,720 satisfactorily pressure and functional 155 00:08:16,250 --> 00:08:13,330 tests alignment electrical continuity 156 00:08:18,420 --> 00:08:16,260 and status checks have been completed 157 00:08:21,030 --> 00:08:18,430 electrical checkout was temporarily 158 00:08:23,730 --> 00:08:21,040 delayed due to modifications to bus 159 00:08:26,340 --> 00:08:23,740 distribution the instrument unit is 160 00:08:29,940 --> 00:08:26,350 ready for integrated tests with the s4 161 00:08:34,710 --> 00:08:29,950 interface and the s-1 system these tests 162 00:08:37,860 --> 00:08:34,720 will begin during October Assembly of 163 00:08:40,070 --> 00:08:37,870 SIU 7 began at Marshall on August 12th 164 00:08:42,450 --> 00:08:40,080 and is continuing satisfactorily 165 00:08:48,330 --> 00:08:42,460 assembly completion is scheduled for 166 00:08:50,580 --> 00:08:48,340 November on August 5th MSFC and Chrysler 167 00:08:54,030 --> 00:08:50,590 completed negotiations modifying the 168 00:08:57,540 --> 00:08:54,040 present s-1 contract to include s1 be 169 00:09:01,770 --> 00:08:57,550 stages the modified contract includes s1 170 00:09:05,100 --> 00:09:01,780 redesign to s1 B configuration delivery 171 00:09:09,510 --> 00:09:05,110 of 12s 1b stages and reduction of the 172 00:09:11,670 --> 00:09:09,520 required number of s1 stages to 8 early 173 00:09:15,330 --> 00:09:11,680 in July Marshall directed Chrysler to 174 00:09:16,860 --> 00:09:15,340 redesign s1 beef fins the eight s one 175 00:09:18,990 --> 00:09:16,870 stage stub fins 176 00:09:21,090 --> 00:09:19,000 did not provide an adequate vehicle 177 00:09:24,480 --> 00:09:21,100 stability margin for manned spacecraft 178 00:09:27,690 --> 00:09:24,490 manual abort the redesign provides the 179 00:09:34,080 --> 00:09:27,700 required vehicle stability and a 2500 180 00:09:37,800 --> 00:09:34,090 pound s1 B stage weight reduction the 181 00:09:38,700 --> 00:09:37,810 s4v Saturn 1b contract negotiations at 182 00:09:41,130 --> 00:09:38,710 Santa Monica 183 00:09:43,470 --> 00:09:41,140 were completed on August 6th the 184 00:09:45,390 --> 00:09:43,480 contract signed by Douglas on September 185 00:09:46,950 --> 00:09:45,400 10th has been submitted to NASA 186 00:09:49,410 --> 00:09:46,960 headquarters for approval of 187 00:09:55,290 --> 00:09:49,420 manufacturing and delivering of for R&D 188 00:09:56,880 --> 00:09:55,300 s4 b 1b stages construction of the s4 B 189 00:09:59,220 --> 00:09:56,890 Assembly Building at Douglass's 190 00:10:02,220 --> 00:09:59,230 Huntington Beach facility is continuing 191 00:10:04,290 --> 00:10:02,230 and tooling is being installed assembly 192 00:10:06,470 --> 00:10:04,300 tower foundations have been finished and 193 00:10:08,610 --> 00:10:06,480 structural steel is being erected 194 00:10:10,880 --> 00:10:08,620 Construction is behind schedule however 195 00:10:13,410 --> 00:10:10,890 because of delays and contract award 196 00:10:16,050 --> 00:10:13,420 present estimated start of stage 197 00:10:18,840 --> 00:10:16,060 assembly is November 30th 198 00:10:21,450 --> 00:10:18,850 at Sacto Douglas has successfully 199 00:10:23,550 --> 00:10:21,460 completed s4b battleship tank 200 00:10:26,700 --> 00:10:23,560 hydrostatic and mass spectrometer leak 201 00:10:28,860 --> 00:10:26,710 tests as well as tank calibration at the 202 00:10:30,750 --> 00:10:28,870 present time the tank is being prepared 203 00:10:32,730 --> 00:10:30,760 for installation of the internal 204 00:10:35,460 --> 00:10:32,740 insulation and is scheduled to be 205 00:10:39,570 --> 00:10:35,470 installed in beta test stand one by 206 00:10:42,240 --> 00:10:39,580 mid-november 1963 at santa monica the 207 00:10:44,820 --> 00:10:42,250 s4b dynamics stage fabrication and 208 00:10:47,370 --> 00:10:44,830 assembly is underway the common bulkhead 209 00:10:49,470 --> 00:10:47,380 aft dome assembly is being prepared for 210 00:10:52,470 --> 00:10:49,480 welding to the just completed tearing 211 00:10:54,450 --> 00:10:52,480 all common bulkhead foward dome segments 212 00:10:57,260 --> 00:10:54,460 have been fabricated and are presently 213 00:10:59,910 --> 00:10:57,270 being installed in the Meridian welder 214 00:11:02,010 --> 00:10:59,920 3lh two cylinder skins have been 215 00:11:04,920 --> 00:11:02,020 finished machined and are being formed 216 00:11:06,930 --> 00:11:04,930 at da C's Long Beach facility while two 217 00:11:07,350 --> 00:11:06,940 others are being rough machined at Santa 218 00:11:09,600 --> 00:11:07,360 Monica 219 00:11:11,340 --> 00:11:09,610 following milling machine adjustments 220 00:11:12,870 --> 00:11:11,350 the cylinder skins will be finished 221 00:11:19,650 --> 00:11:12,880 machined and forwarded to Long Beach 222 00:11:22,200 --> 00:11:19,660 performing construction of complex beta 223 00:11:23,010 --> 00:11:22,210 for s4b testing is continuing on 224 00:11:24,870 --> 00:11:23,020 schedule 225 00:11:27,090 --> 00:11:24,880 erection of test stand one 226 00:11:29,330 --> 00:11:27,100 superstructure has now been completed 227 00:11:32,520 --> 00:11:29,340 with the exception of the way bridge 228 00:11:34,320 --> 00:11:32,530 tests tan threes concrete foundation has 229 00:11:36,930 --> 00:11:34,330 been completed with direction of 230 00:11:39,120 --> 00:11:36,940 structural steel underway beta one 231 00:11:42,000 --> 00:11:39,130 instrumentation tunnel construction has